Founded on July 1st, 1999, our factory is located in the Furong Ave., Huadu, covering an area of 14,000m2 with a building area of 5000m2, including3000m2 for workshops and 150m2 for labouratories. There are 92 sets of equipments, including 44 units of main equipments and 13 units of inspection equipments. The total machine assembly capacity is 580KW. There are 307 units of assembly moulds. There are over 120 regular employees, 10 of whom are technical secondary school graduates or above level with such tech...
|